css-plus
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/wjhiggin/public_html/wp-includes/functions.php on line 6121js_composer
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/wjhiggin/public_html/wp-includes/functions.php on line 6121qi-blocks
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/wjhiggin/public_html/wp-includes/functions.php on line 6121bridge
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/wjhiggin/public_html/wp-includes/functions.php on line 6121LOCATION
Edwardsville, IL
ARCHITECT
Trivers Associcates
CLIENT
Trivers Associates
OWNER
Southern Illinois University
SCOPE OF SERVICES
W.J. Higgins & Associates, Inc. was contracted by Trivers Associates to assist with the schematic design phase activities related to the renovation of the existing building including system and detail development and evaluation of the proposed assemblies, integration of existing systems with the new assemblies, cost estimates of assemblies, u-value requirements as well as air and water performance. WJH&A also provided construction document and construction administration services on the buildings as well. WJH&A performed an as-built condition assessment, glass block removal logistics and system installation analysis. Assisted with technical specifications, finalized performance specification, coordinated project team to ensure design was constructible, practical and economical. Worked with the design team to develop design documents.